Combined cycle CHP plant: OT emergency drill in the browser
Combined cycle CHP plant, 100 MW electrical. The plant is entirely fictitious but built the way such plants typically are.
The plant simulations are currently in German. English versions are in preparation and will be linked here as soon as they are online.
This plant is available as a full version with a voucher. Ask for a voucher or try a plant with a free version.
Control system and process
Gas turbine, heat recovery steam generator and steam turbine with district heating, run by a power plant control system.
Typical attack and failure scenarios
Manipulated load or pressure setpoints, loss of operator stations, disturbed grid connection.
Physical consequences in an emergency
Emergency shutdown, loss of power and district heating, damage to turbine and boiler.
The 45-minute shift drill
- 5 minutes: situation in the control room, roles in the shift
- 25 minutes: detect the attack or disturbance, work through your own emergency plan, switch to manual operation or a safe state
- 10 minutes: restart, check reporting lines and decisions
- 5 minutes: short debrief, one improvement for the emergency plan
In OT the same rule applies as for firefighters: 45 minutes of practice a month help more in an emergency than an expensive cyber range every two years or an annual exercise that ends up in a drawer. We get the operating team ready once (one-day onboarding, on site or remote). After that, every shift rehearses its real emergency plan once a month on its own, 45 minutes on a comparable plant in the browser: 12 drills a year with the annual licence.